Filtros : "International Journal of Production Research" Limpar

Filtros



Refine with date range


  • Source: International Journal of Production Research. Unidade: ICMC

    Subjects: CUSTO INDUSTRIAL, GEOMETRIA E MODELAGEM COMPUTACIONAL, PRODUÇÃO INDUSTRIAL

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      TOMAZELLA, Caio Paziani et al. Service-level-driven procurement and production lot-sizing problem with demand fulfilment. International Journal of Production Research, v. 62, n. 6, p. 1977-1998, 2024Tradução . . Disponível em: https://doi.org/10.1080/00207543.2023.2204958. Acesso em: 27 abr. 2024.
    • APA

      Tomazella, C. P., Santos, M. O. dos, Alem Junior, D. J., & Jans, R. (2024). Service-level-driven procurement and production lot-sizing problem with demand fulfilment. International Journal of Production Research, 62( 6), 1977-1998. doi:10.1080/00207543.2023.2204958
    • NLM

      Tomazella CP, Santos MO dos, Alem Junior DJ, Jans R. Service-level-driven procurement and production lot-sizing problem with demand fulfilment [Internet]. International Journal of Production Research. 2024 ; 62( 6): 1977-1998.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2023.2204958
    • Vancouver

      Tomazella CP, Santos MO dos, Alem Junior DJ, Jans R. Service-level-driven procurement and production lot-sizing problem with demand fulfilment [Internet]. International Journal of Production Research. 2024 ; 62( 6): 1977-1998.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2023.2204958
  • Source: International Journal of Production Research. Unidade: ICMC

    Subjects: CORTE, ESTOQUES, PROGRAMAÇÃO LINEAR, BENCHMARKS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MARTIN, Mateus et al. Models for two- and three-stage two-dimensional cutting stock problems with a limited number of open stacks. International Journal of Production Research, v. 61, n. 9, p. 2895-2916, 2023Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2070882. Acesso em: 27 abr. 2024.
    • APA

      Martin, M., Yanasse, H. H., Santos, M. O. dos, & Morabito, R. (2023). Models for two- and three-stage two-dimensional cutting stock problems with a limited number of open stacks. International Journal of Production Research, 61( 9), 2895-2916. doi:10.1080/00207543.2022.2070882
    • NLM

      Martin M, Yanasse HH, Santos MO dos, Morabito R. Models for two- and three-stage two-dimensional cutting stock problems with a limited number of open stacks [Internet]. International Journal of Production Research. 2023 ; 61( 9): 2895-2916.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2022.2070882
    • Vancouver

      Martin M, Yanasse HH, Santos MO dos, Morabito R. Models for two- and three-stage two-dimensional cutting stock problems with a limited number of open stacks [Internet]. International Journal of Production Research. 2023 ; 61( 9): 2895-2916.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2022.2070882
  • Source: International Journal of Production Research. Unidade: EESC

    Subjects: ENGENHARIA DE PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO, ALGORITMOS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ABREU, Levi R. e NAGANO, Marcelo Seido e PRATA, Bruno A. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research, 2022Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2154404. Acesso em: 27 abr. 2024.
    • APA

      Abreu, L. R., Nagano, M. S., & Prata, B. A. (2022). A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research. doi:10.1080/00207543.2022.2154404
    • NLM

      Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2022.2154404
    • Vancouver

      Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2022.2154404
  • Source: International Journal of Production Research. Unidade: EESC

    Subjects: SEQUENCIAÇÃO DA PRODUÇÃO, SCHEDULING, PROGRAMAÇÃO LINEAR, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTA, Jatinder N. D. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function. International Journal of Production Research, p. 1-29, 2022Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2127959. Acesso em: 27 abr. 2024.
    • APA

      Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2022). Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function. International Journal of Production Research, 1-29. doi:10.1080/00207543.2022.2127959
    • NLM

      Miyata HH, Nagano MS, Gupta JND. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function [Internet]. International Journal of Production Research. 2022 ; 1-29.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2022.2127959
    • Vancouver

      Miyata HH, Nagano MS, Gupta JND. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function [Internet]. International Journal of Production Research. 2022 ; 1-29.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2022.2127959
  • Source: International Journal of Production Research. Unidade: FEARP

    Subjects: FORÇA DE TRABALHO, PROGRAMAÇÃO LINEAR, CARGA DE TRABALHO, CUSTO ECONÔMICO

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      DOAN, M. P. et al. Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem. International Journal of Production Research, 2021Tradução . . Disponível em: https://doi.org/10.1080/00207543.2020.1867922. Acesso em: 27 abr. 2024.
    • APA

      Doan, M. P., Fondrevelle, J., Botta-Genoulaz, V., & Ribeiro, J. F. F. (2021). Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem. International Journal of Production Research. doi:10.1080/00207543.2020.1867922
    • NLM

      Doan MP, Fondrevelle J, Botta-Genoulaz V, Ribeiro JFF. Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem [Internet]. International Journal of Production Research. 2021 ;[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2020.1867922
    • Vancouver

      Doan MP, Fondrevelle J, Botta-Genoulaz V, Ribeiro JFF. Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem [Internet]. International Journal of Production Research. 2021 ;[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2020.1867922
  • Source: International Journal of Production Research. Unidade: ICMC

    Subjects: OTIMIZAÇÃO COMBINATÓRIA, PESQUISA OPERACIONAL, GEOMETRIA COMPUTACIONAL, ESTRUTURAS DE DADOS

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      CHERRI, Luiz Henrique et al. An innovative data structure to handle the geometry of nesting problems. International Journal of Production Research, v. 56, n. 23, p. 7085-7102, 2018Tradução . . Disponível em: https://doi.org/10.1080/00207543.2017.1413256. Acesso em: 27 abr. 2024.
    • APA

      Cherri, L. H., Cherri, A. C., Carravilla, M. A., Oliveira, J. F., Toledo, F. M. B. de, & Vianna, A. C. G. (2018). An innovative data structure to handle the geometry of nesting problems. International Journal of Production Research, 56( 23), 7085-7102. doi:10.1080/00207543.2017.1413256
    • NLM

      Cherri LH, Cherri AC, Carravilla MA, Oliveira JF, Toledo FMB de, Vianna ACG. An innovative data structure to handle the geometry of nesting problems [Internet]. International Journal of Production Research. 2018 ; 56( 23): 7085-7102.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2017.1413256
    • Vancouver

      Cherri LH, Cherri AC, Carravilla MA, Oliveira JF, Toledo FMB de, Vianna ACG. An innovative data structure to handle the geometry of nesting problems [Internet]. International Journal of Production Research. 2018 ; 56( 23): 7085-7102.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2017.1413256
  • Source: International Journal of Production Research. Unidade: ICMC

    Subjects: ALGORITMOS, PROGRAMAÇÃO NÃO LINEAR, ANÁLISE DE COORTE, EMBALAGENS, HEURÍSTICA

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MUNDIM, Leandro R et al. A general heuristic for two-dimensional nesting problems with limited-size containers. International Journal of Production Research, v. 56, n. 1-2, p. 709-732, 2018Tradução . . Disponível em: https://doi.org/10.1080/00207543.2017.1394598. Acesso em: 27 abr. 2024.
    • APA

      Mundim, L. R., Andretta, M., Carravilla, M. A., & Oliveira, J. F. (2018). A general heuristic for two-dimensional nesting problems with limited-size containers. International Journal of Production Research, 56( 1-2), 709-732. doi:10.1080/00207543.2017.1394598
    • NLM

      Mundim LR, Andretta M, Carravilla MA, Oliveira JF. A general heuristic for two-dimensional nesting problems with limited-size containers [Internet]. International Journal of Production Research. 2018 ; 56( 1-2): 709-732.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2017.1394598
    • Vancouver

      Mundim LR, Andretta M, Carravilla MA, Oliveira JF. A general heuristic for two-dimensional nesting problems with limited-size containers [Internet]. International Journal of Production Research. 2018 ; 56( 1-2): 709-732.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2017.1394598
  • Source: International Journal of Production Research. Unidade: ICMC

    Subjects: ALGORITMOS, OTIMIZAÇÃO COMBINATÓRIA, PESQUISA OPERACIONAL

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LEÃO, Aline A. S et al. A semi-continuous MIP model for the irregular strip packing problem. International Journal of Production Research, n. 3, p. 712-721, 2016Tradução . . Disponível em: https://doi.org/10.1080/00207543.2015.1041571. Acesso em: 27 abr. 2024.
    • APA

      Leão, A. A. S., Toledo, F. M. B. de, Oliveira, J. F., & Carravilla, M. A. (2016). A semi-continuous MIP model for the irregular strip packing problem. International Journal of Production Research, ( 3), 712-721. doi:10.1080/00207543.2015.1041571
    • NLM

      Leão AAS, Toledo FMB de, Oliveira JF, Carravilla MA. A semi-continuous MIP model for the irregular strip packing problem [Internet]. International Journal of Production Research. 2016 ;( 3): 712-721.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2015.1041571
    • Vancouver

      Leão AAS, Toledo FMB de, Oliveira JF, Carravilla MA. A semi-continuous MIP model for the irregular strip packing problem [Internet]. International Journal of Production Research. 2016 ;( 3): 712-721.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2015.1041571
  • Source: International Journal of Production Research. Unidades: EP, FEA

    Subjects: INTERNALIZAÇÃO, PAÍSES EM DESENVOLVIMENTO, EMPRESAS MULTINACIONAIS

    PrivadoAcesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      FLEURY, Afonso et al. Developing an analytical framework for study of emerging country multinationals’ operations management. International Journal of Production Research, v. 53 n. 18, p. 5418-5436, 2015Tradução . . Disponível em: https://doi.org/10.1080/00207543.2015.1005252. Acesso em: 27 abr. 2024.
    • APA

      Fleury, A., Shi, Y., Ferreira Júnior, S. C., Cordeiro, J. H. D. 'O., & Fleury, M. T. L. (2015). Developing an analytical framework for study of emerging country multinationals’ operations management. International Journal of Production Research, 53 n. 18, 5418-5436. doi:10.1080/00207543.2015.1005252
    • NLM

      Fleury A, Shi Y, Ferreira Júnior SC, Cordeiro JHD'O, Fleury MTL. Developing an analytical framework for study of emerging country multinationals’ operations management [Internet]. International Journal of Production Research. 2015 ; 53 n. 18 5418-5436.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2015.1005252
    • Vancouver

      Fleury A, Shi Y, Ferreira Júnior SC, Cordeiro JHD'O, Fleury MTL. Developing an analytical framework for study of emerging country multinationals’ operations management [Internet]. International Journal of Production Research. 2015 ; 53 n. 18 5418-5436.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2015.1005252
  • Source: International Journal of Production Research. Unidade: EESC

    Subjects: PROGRAMAÇÃO LINEAR, DESEMPENHO ORGANIZACIONAL

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOUZA, Fernando Bernardi de et al. When less is better: insights from the product mix dilemma from the theory of constraints perspective. International Journal of Production Research, v. 51, n. 19, p. 5839-5832, 2013Tradução . . Disponível em: https://doi.org/10.1080/00207543.2013.802052. Acesso em: 27 abr. 2024.
    • APA

      Souza, F. B. de, Sobreiro, V. A., Nagano, M. S., & Manfrinato, J. W. de S. (2013). When less is better: insights from the product mix dilemma from the theory of constraints perspective. International Journal of Production Research, 51( 19), 5839-5832. doi:10.1080/00207543.2013.802052
    • NLM

      Souza FB de, Sobreiro VA, Nagano MS, Manfrinato JW de S. When less is better: insights from the product mix dilemma from the theory of constraints perspective [Internet]. International Journal of Production Research. 2013 ; 51( 19): 5839-5832.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2013.802052
    • Vancouver

      Souza FB de, Sobreiro VA, Nagano MS, Manfrinato JW de S. When less is better: insights from the product mix dilemma from the theory of constraints perspective [Internet]. International Journal of Production Research. 2013 ; 51( 19): 5839-5832.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2013.802052
  • Source: International Journal of Production Research. Unidade: EESC

    Subjects: HEURÍSTICA, DESEMPENHO ORGANIZACIONAL

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOBREIRO, Vinicius Amorim e NAGANO, Marcelo Seido. A review and evaluation on constructive heuristics to optimise product mix based on the theory of constraints. International Journal of Production Research, v. 50, n. 20, p. 5936-5948, 2012Tradução . . Disponível em: https://doi.org/10.1080/00207543.2011.638940. Acesso em: 27 abr. 2024.
    • APA

      Sobreiro, V. A., & Nagano, M. S. (2012). A review and evaluation on constructive heuristics to optimise product mix based on the theory of constraints. International Journal of Production Research, 50( 20), 5936-5948. doi:10.1080/00207543.2011.638940
    • NLM

      Sobreiro VA, Nagano MS. A review and evaluation on constructive heuristics to optimise product mix based on the theory of constraints [Internet]. International Journal of Production Research. 2012 ; 50( 20): 5936-5948.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2011.638940
    • Vancouver

      Sobreiro VA, Nagano MS. A review and evaluation on constructive heuristics to optimise product mix based on the theory of constraints [Internet]. International Journal of Production Research. 2012 ; 50( 20): 5936-5948.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2011.638940
  • Source: International Journal of Production Research. Unidade: ICMC

    Subjects: OTIMIZAÇÃO COMBINATÓRIA, PESQUISA OPERACIONAL

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BELO FILHO, Márcio Antônio Ferreira e SANTOS, Maristela Oliveira dos e MENESES, Claudio Nogueira de. Asynchronous teams for joint lot-sizing and scheduling problem in flow shops. International Journal of Production Research, v. 50, n. 20, p. 5809-5822, 2012Tradução . . Disponível em: https://doi.org/10.1080/00207543.2011.628955. Acesso em: 27 abr. 2024.
    • APA

      Belo Filho, M. A. F., Santos, M. O. dos, & Meneses, C. N. de. (2012). Asynchronous teams for joint lot-sizing and scheduling problem in flow shops. International Journal of Production Research, 50( 20), 5809-5822. doi:10.1080/00207543.2011.628955
    • NLM

      Belo Filho MAF, Santos MO dos, Meneses CN de. Asynchronous teams for joint lot-sizing and scheduling problem in flow shops [Internet]. International Journal of Production Research. 2012 ; 50( 20): 5809-5822.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2011.628955
    • Vancouver

      Belo Filho MAF, Santos MO dos, Meneses CN de. Asynchronous teams for joint lot-sizing and scheduling problem in flow shops [Internet]. International Journal of Production Research. 2012 ; 50( 20): 5809-5822.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2011.628955
  • Source: International Journal of Production Research. Unidade: EP

    Subjects: SCHEDULING, HEURÍSTICA, SIMULAÇÃO

    Acesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PEREIRA, Mário Tonizza e SANTORO, Miguel. An integrative heuristic method for detailed operations scheduling in assembly job shop systems. International Journal of Production Research, v. 49, n. 20, p. 6089–6105, 2011Tradução . . Disponível em: https://doi.org/10.1080/00207543.2010.527385. Acesso em: 27 abr. 2024.
    • APA

      Pereira, M. T., & Santoro, M. (2011). An integrative heuristic method for detailed operations scheduling in assembly job shop systems. International Journal of Production Research, 49( 20), 6089–6105. doi:10.1080/00207543.2010.527385
    • NLM

      Pereira MT, Santoro M. An integrative heuristic method for detailed operations scheduling in assembly job shop systems [Internet]. International Journal of Production Research. 2011 ;49( 20): 6089–6105.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2010.527385
    • Vancouver

      Pereira MT, Santoro M. An integrative heuristic method for detailed operations scheduling in assembly job shop systems [Internet]. International Journal of Production Research. 2011 ;49( 20): 6089–6105.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207543.2010.527385
  • Source: International Journal of Production Research. Unidade: FEARP

    Subjects: EMPRESAS, GESTÃO AMBIENTAL, DESENVOLVIMENTO DE PRODUTOS, SUSTENTABILIDADE

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      JABBOUR, Charbel José Chiappetta. In the eye of the storm: exploring the introduction of environmental issues in the production function in Brazilian companies. International Journal of Production Research, v. 48, n. 21, p. 6315-6339, 2010Tradução . . Disponível em: https://doi.org/10.1080/00207540802425401. Acesso em: 27 abr. 2024.
    • APA

      Jabbour, C. J. C. (2010). In the eye of the storm: exploring the introduction of environmental issues in the production function in Brazilian companies. International Journal of Production Research, 48( 21), 6315-6339. doi:10.1080/00207540802425401
    • NLM

      Jabbour CJC. In the eye of the storm: exploring the introduction of environmental issues in the production function in Brazilian companies [Internet]. International Journal of Production Research. 2010 ; 48( 21): 6315-6339.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207540802425401
    • Vancouver

      Jabbour CJC. In the eye of the storm: exploring the introduction of environmental issues in the production function in Brazilian companies [Internet]. International Journal of Production Research. 2010 ; 48( 21): 6315-6339.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207540802425401
  • Source: International Journal of Production Research. Unidade: ICMC

    Assunto: ENGENHARIA DE PRODUÇÃO

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MORABITO NETO, Reinaldo e ARENALES, Marcos Nereu. Optimizing the cutting of stock plates in a furniture company. International Journal of Production Research, v. 38, n. 12, p. 2725-2742, 2000Tradução . . Disponível em: https://doi.org/10.1080/002075400411457. Acesso em: 27 abr. 2024.
    • APA

      Morabito Neto, R., & Arenales, M. N. (2000). Optimizing the cutting of stock plates in a furniture company. International Journal of Production Research, 38( 12), 2725-2742. doi:10.1080/002075400411457
    • NLM

      Morabito Neto R, Arenales MN. Optimizing the cutting of stock plates in a furniture company [Internet]. International Journal of Production Research. 2000 ; 38( 12): 2725-2742.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/002075400411457
    • Vancouver

      Morabito Neto R, Arenales MN. Optimizing the cutting of stock plates in a furniture company [Internet]. International Journal of Production Research. 2000 ; 38( 12): 2725-2742.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/002075400411457
  • Source: International Journal of Production Research. Unidade: EESC

    Subjects: AUTOMAÇÃO INDUSTRIAL, CAPP

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROZENFELD, Henrique e KERRY, Haroldo Thomaz. Automated process planning for parametric parts. International Journal of Production Research, v. 37, n. 17, p. 3981-3993, 1999Tradução . . Disponível em: https://doi.org/10.1080/002075499189871. Acesso em: 27 abr. 2024.
    • APA

      Rozenfeld, H., & Kerry, H. T. (1999). Automated process planning for parametric parts. International Journal of Production Research, 37( 17), 3981-3993. doi:10.1080/002075499189871
    • NLM

      Rozenfeld H, Kerry HT. Automated process planning for parametric parts [Internet]. International Journal of Production Research. 1999 ; 37( 17): 3981-3993.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/002075499189871
    • Vancouver

      Rozenfeld H, Kerry HT. Automated process planning for parametric parts [Internet]. International Journal of Production Research. 1999 ; 37( 17): 3981-3993.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/002075499189871
  • Source: International Journal of Production Research. Unidade: ICMC

    Assunto: COMBINATÓRIA

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      RIBEIRO, José Francisco Ferreira e PRADIN, B. A methodology for cellular manufacturing design. International Journal of Production Research, v. 3, n. 1, p. 235-250, 1993Tradução . . Disponível em: https://doi.org/10.1080/00207549308956723. Acesso em: 27 abr. 2024.
    • APA

      Ribeiro, J. F. F., & Pradin, B. (1993). A methodology for cellular manufacturing design. International Journal of Production Research, 3( 1), 235-250. doi:10.1080/00207549308956723
    • NLM

      Ribeiro JFF, Pradin B. A methodology for cellular manufacturing design [Internet]. International Journal of Production Research. 1993 ; 3( 1): 235-250.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207549308956723
    • Vancouver

      Ribeiro JFF, Pradin B. A methodology for cellular manufacturing design [Internet]. International Journal of Production Research. 1993 ; 3( 1): 235-250.[citado 2024 abr. 27 ] Available from: https://doi.org/10.1080/00207549308956723

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024